Key sealing parts need to be checked one by one by XIAO VALVE inspectors and checked in all directions with customer’s custom drawings. In particular, we need to test the sealing surface for size, finish and chamfering to ensure that there will be no installation errors after the ball valve of XIAO VALVE is installed on the pipeline.
Recent Comments